City of Oakdale, MN Workshop
Tuesday, Aug. 25, 2026
Everything on this page comes from public records, linked below. Last checked September 19, 2026. See an error? Tell us.
Watch recording
Agenda with times
- 1.THIS DRAWING DOES NOT CONSTITUTE AN OFFICIAL SURVEY OF THE SITE. CONFIRM THE PLAN TAKES PRECEDENCE OVER THE PLANT SCHEDULE IF DISCREPANCIES EXIST CONFIRM ALL QUANTITIES, SHAPES, AND LOCATIONS OF LANDSCAPE AREAS, AND VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO DIGGING. NOTIFY THE THE CONTRACTOR IS RESPONSIBLE FOR ALL MULCHES AND SOIL QUANTITIES TO REFER TO SPECIFICATION SECTION 31 2323 FILL FOR SOIL TYPES AND REFER TO SPECIFICATION SECTION 32 9300 FOR MULCH TYPES AND STAKE TREE LAYOUT IN-FIELD FOR LANDSCAPE ARCHITECT APPROVAL PRIOR TO PROTECT EXISTING TREES. DO NOT STORE OR DRIVE HEAVY MATERIALS OVER TREE KEEP PAVEMENTS, FIXTURES AND BUILDINGS CLEAN AND UNSTAINED. ANY DAMAGE TO PROVIDE AND MAINTAIN INLET AND PERIMETER EROSION CONTROL BMPS AS SPECIFIED ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION WILL BE RESTORED WITH SEED PLANT TREE ROOT BALLS FLUSH WITH FINAL GRADE AND THE TOP OF ROOT FLARE NO SUBSTITUTIONS OF PLANT MATERIAL WILL BE ACCEPTED UNLESS APPROVED IN THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY HEEL IN AND WATER ANY PLANT STOCK NOT PLANTED WITHIN 24 HOURS OF DELIVERY REFER TO SPECIFICATIONS FOR WARRANTY REQUIREMENTS AND OTHER PLANTING BEGIN PLANT MAINTENANCE IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN MAINTENANCE INCLUDES WATERING, WEEDING, MULCHING, REMOVAL OF DEAD REFER TO SPECIFICATIONS FOR FULL INSPECTION, MAINTENANCE, AND WARRANTY PICNIC TABLE AND BENCHES TO BE PROVIDED BY OWNER, PLAYGROUND VENDOR OWNER TO PROVIDE AND INSTALL TRASH AND RECYCLING BINS. COORDINATE WITH
EnvironmentUtilitiesParksSolid Waste
Sources
Transcript
No transcript available for this meeting yet.